Saturday, 7 March 2015

Fleet Storm Relief, LON

Ojay, TheVicar...


There is one problem with rivers, they are prone to flooding..
And so, the Fleet Storm Relief Sewer was built in the 1875 in order to give extra capacity to the Fleet Sewer.
In 1317 a long drought was broken by an enormous thunderstorm.
The resulting flood caused serious damage to both Holborn and Fleet bridges in the city.
1768 a severe storm resulted in the river covering Bagnigge Wells (on King’s Cross Road).
Four feet of water and carried off three cattle and several pigs.
There were serious floods in 1809 and 1818; in the latter the water rose several feet in the night.
1846 a violent thunderstorm caused the then enclosed river to quite literally blow up.
A boat was smashed against the pier at Blackfriars Bridge and cellars in Farringdon Street were flooded.
1862, the river burst out of its pipe during the construction of the Metropolitan Railway at King’s Cross and caused major damage.

The Fleet mainline is one amazing system having completed it from top to bottom.

But I'd always dismissed the storm relief as being somewhat uneventful having poked here and there.

Sure it's not as feature packed, but what it does have to offer is pretty cool in it's own rights.

..And let's not forget it is a relief sewer after all.

I'd made a few trips down here on and off with TheVicar and once a bit of the upstream section with Adders.

The usual excuse of work, weather and other distractions meant I'd stuck this on the back burner.

A short distance from Camden Town station is the first interaction with the Fleet Storm Relief.

Here, it also interacts with the High Level Storm Relief.


Below ground a large diameter brick pipe carries spill flows.

At this point it's known as the Fleet Storm Relief Extension
(North of the Middle Level No.2 Interceptor looking at the main drainage map).


Just before the ML No.2,  is another CSO which drops into the storm relief from the Fleet Mainline.



The upstream stretch lacks any real features, so on a follow up visit we nipped down a lid upstream of St. Pancras/Kings Cross.

Finding a lid that isn't located in a road proved difficult.

The few side entry ones that do exist boast a rather neat looking spiral staircase to the relief sewer below.

It goes without saying, polystyrene balls 20m up in a manhole shaft means business!


Once down, we dropped back into the 8ft yellow RBP, the invert here constructed of a tougher engineering brick for good measure.


A short distance down, construction changed to a 6ft GRP for the next 60m as it passes below St. Pancras.

GRP = a nightmare to traverse, as slippery as hell.

Thankfully it wasn't long before we were back in the large diameter brick pipe.

Further down, a more recent connection to the Fleet Mainline via a modern looking overflow within a large concrete drop shaft.


To better explain this, I'll drop in a couple of bits from the thread I originally covered on the Fleet Mainline..

The course of the Fleet was diverted in 2004, as construction was undertaken for the Eurostar rail link below St. Pancras International Station.


An older connection to the storm relief downstream of Kings Cross was bricked up and replaced at this point.

Either side of the sewer, raised spillways lead to a 5ft RCP, which in turn connects back to the newer drop shaft as shown further above ^^


Continuing the journey back in the Fleet Storm Relief, the 8ft RBP continues on downstream without change, with the occasional manhole chiming from the traffic above.

In fact I only saw one other side entry on this stretch, which would be a concern if it started to rain!

Eventually we arrived at a junction below Gray's Inn Road..


It was at this point, when we originally ventured down this stretch adders wandered off up the spur on the right.


With TheVicar and myself, busy waving torches about and taking pics we lost all track of time.

..what seemed like an age was probably about 5-10 mins in reality.

And there it was, a loud rush of water, it was a brown underpants moment for all concerned, and in the distance adders making a run for it.

Unbeknown to us, he had managed to escape to the safety of a manhole shaft hence his light going dead..

After a minute or so, no obvious wall of water, however there was now a steady flow of clean (ish) looking water heading our way.

We had no choice but to head up the pipe as unsure of adders whereabouts.

Eventually, he re-appeared and we both breathed a sigh of relief.

Around 50m upstream of said manhole shaft was a small tumbling bay, the flow of water was no longer present so we assumed it came from upstream ?

Not wanting to hang about I grabbed a quick pic and we bailed..


As I looked up into the spillway above I instantly recognised where we were.

Quickly packing up, having heard the racket previously from the Fleet Mainline was a concern.

Of course we were now eager to solve the phenomenon that had caught others out too, but not tonite!

Here is the overflow looking back down from the Fleet Mainline.


4 Large apertures allow any spill flows when at capacity to be diverted to the Storm Relief below..



Some 8 months later TheVicar and I decided to head back and check out the downstream stretch.

However the mystery of the intermittent discharge got the better of us and needed putting to bed.

In the end it turned out to be a 400m side pipe which lets rip approx every 15-20 mins.

Beyond which appeared to be some kind of holding tank with a deep looking pit below, there was also a glimpse of a ladder..

I'm still not sure what the deal was with this setup and probably never will.

The real annoyance being that this was the only point the GoPro wasn't recording, so sadly no pics :(

We did however head up the tumbling bay and beyond, for a good distance before turning back.

Having looked at the main drainage map, it appears to be a stretch of overflow which serves a branch of the Fleet heading up Caledonia Rd.


On the final trip, I headed downstream with TheVicar to fill in a few more gaps from a previous outing..


The last stretch passes below Farringdon, close to New Fetter Lane, before heading down towards Blackfriars.


Further down the regular trickle from the rising water table which runs through the system is carried away.

It eventually exits via a small tumbling bay, and around the corner to the Low Level No.2 Interceptor below.


Beyond the dam board, is the final stretch towards the Thames.

*Note the tidal fudge;

Even though this is a couple of hundred metres upstream, it backfills from the Thames at high tide!


Further down you can see the water springing through the wall of the Storm Relief.


Beyond this, 2 apertures on the L.H.S heading downstream allow spill flows from the Fleet Mainline near to the Interceptor.


2 x 6ft brick pipes lead to a small overflow chamber, where two valves are used to divert the flow.


Ahead, a ladder leads up to the surface and also a walkway which curves round and ends with an iron wall.


Further down the relief widens to a good 10ft as the pipe splits and heads towards the Outfall Chamber.


Looking back upstream..


Both splits are identical and stop short of 2 reasonable sized valves (flaps).


These are located the other side in an intermediate overflow chamber that serves the Fleet Storm Relief, before entering the main Outfall Chamber..


And finally the Outfall Chamber below Blackfriars, which deals with flows from the storm relief and the Fleet Mainline and Low Level No.2 when at capacity.


Not forgetting the entire downstream section is tidal, and backfills a good distance,
the tide was indeed turning, time to pack up and bail.

Thanks for looking :)

Tuesday, 27 January 2015

Tranmere Deep Level Shelter, Wirral

Ojay, The Kwan, Marsden1002...

During the 1940's the Home Office gave the County Borough of Birkenhead the green light to build the most expensive deep tunnel air raid shelter of its kind in the country.
With space for 4560 bunked and 1600 seated occupants, the staggering system below Tranmere reveals the importance placed on local labourers by the government. 
Simply put, if Wirral was to play its part in the war effort, the manpower of Cammell Laird and the docks had to be protected from Nazi bombing. 
Currently held by the National Archive, Cabinet Office document 10131/4363 puts the estimated cost of the venture at £119,000. 
It was decided in the event of a nuclear attack, the Tranmere bunker was capable of being used by the public, but a second system under Bidston was not capable at short notice due to rotten supports. 
In the post-war rush to utilise resources, the system was stripped, but the signage and brickwork remain.
I Never thought this place would see the light again, and is certainly a grail as far as the Wirral goes!


Overlay produced by nick,
 from a plan kindly sent from canute originally prepared by Stevie Wonder


We dropped in near to what would have been one of the main 'usable' entrances for the shelter.

A couple of side rooms and passageways going off in different directions, along with a toilet block a short distance away.


In one of those side rooms, amongst the burnt remains of a commer van (obviously myself and The Kwan old enough to remember those).

Safe

Not sure why that would have been in there,
 but alas no swag as the mighty plasma cutter had beaten us to it.


Round the corner, a curious archway leads to a larger passageway, which appears to be the main drag in/out of the shelter.


As you can see the passageway was blasted, the paved walkway looking a bit sorry these days compared to the rest of the shelter.


Once at the other end, we were now in the confines of the main shelter


The layout of the shelter is a grid formation, very similar to Bidston, although this place was much bigger.

We had a leisurely stroll through the various passageways and rooms which have been largely un-touched.

Only the elements and signs of slight vandalism can be found here and there.



^ Note the galvanised cladding used as a false ceiling, both aesthetic and also to protect against any falls from the sandstone above.

Here, sections have been removed to expose the sandstone beyond.




Sadly, the place is an accident waiting to happen..

This fresh fall is only a few days old and it's fair to say caused by disturbances from the recent activity.


There are a number of emergency exits from within the shelter, here an old escape shaft under Olive Mount.



No shelter is complete without a number of lavatories, there certainly are plenty of them as up to 6,000 people needed to pay a visit.

Women



Men




There was also a canteen down here..


Canteen it is, although you will have to sing for your supper these days

"Dish of the day" - Asbestos


We had a look at the central control area, hidden away beyond a non descript asbestos clad door behind a toilet block.

Here the remains of the generator and ventilation gubbins, along with distro boards and other switch gear.

(also note another escape shaft, once concealed behind the 'false' ceiling)



And finally the main emergency exit that once led to the top of the hillside which sparked all that interest back in 2008.


Up top, a ventilation shaft which once led to a surface building at the end of an alleyway close to Thompson Street.


And lastly the +20m shaft looking back down from below the concrete cap


Sealed in 2008 of course ;)


Thanks to The Kwan for the heads up, Marsden for driving, also shouts to Terry and big up the lad who fetched his mum in.